-
Poster at WindEurope 2017 (Amsterdam, Netherlands)
Due to the unique position and the measurement principle the iSpin spinner anemometer technology allows to overcome the limitations...
0 -
Installation tolerances for iSpin sensors at PTP Turbine Type B) kept within +/- 20mm
Except for a few installations all iSpin sensors have been installed for the PTP Turbine type B (Enercon E82-2.3)...
-
10 iSpin commissioned for PTP at complex farm in Portugal
The 2nd wind farm with Enercon E82-2.3MW turbines has been equipped with iSpin for the Performance Transparency Project (PTP)....
-
Poster and Presentation at DEWEK 2017 (Bremen, Germany)
Determining the true performance of each turbine in a wind farm is extremely difficult but not impossible. Nowadays performance...
-
PTP participation agreement signed with EDPR for 10 V112s and 10 E82s
EDPR and ROMO Wind signed an agreement concerning the participation with two of their wind farms in the Performance...
-
More shots on Portugal
The previous described shots were not the only ones made in the project. Also, after the installations have been...
-
Installation Portugal
The installation on the semi-complex terrain in Portugal was the focus of our professional photographer, because that wind park...
-
Further Installations around Europe
After the offshore installation, further installations in Portugal, Poland and Romania followed on different terrain. After the initial excitement,...
-
Installation Offshore
The next installation was on an offshore wind farm. This was also a special moment in the history of...
-
PTP participation agreement signed with Parkwind for 10 V112s at Offshore wind farm
Parkwind and ROMO Wind signed an agreement concerning the participation with one of their wind farms in the Performance...